Development 2013-2016

2013 to 2016 the Port of Kapellskär was modernised. Among other things a new 245 metres long pier was built and the two existing piers were reconstructed. The port went from three to five modern quay-berths.
The port surface has almost doubled in size. Logistic and safety improvements were made and the harbour basin is now deeper. A new pump house was built to manage the vessels' black and grey water and a reservoir was constructed to provide vessels with fresh water.
Port of Kapellskär is now ready to meet current and future market demands for increased volumes and vessel sizes.